Wide Capacity Range
A single unit covers storage duty from medium sites to large municipal projects and works well for peak shaving, buffering, and reserve storage.
Click to view full image
MOTET · GAS STORAGE EQUIPMENT
A floor-standing double membrane gas holder for biogas storage, collection, gas supply, and power-support projects.
For large biogas plants, wastewater facilities, landfill projects, and industrial anaerobic systems, this format balances capacity, safety margin, and maintenance access.
A ground mounted gas holder (also written ground-mounted) and a floor-standing gas holder describe the same installation arrangement here: an independent membrane holder on a prepared foundation, rather than a cover supported by a digester rim. Confirm the foundation, anchoring and usable volume against the approved design.
Gas-holder types and selection basics →A single unit covers storage duty from medium sites to large municipal projects and works well for peak shaving, buffering, and reserve storage.
It does not rely on a digester roof or existing structures, so the layout can better follow site access, maintenance, and plot planning.
Outer-membrane form control and blower logic help maintain smooth back-pressure and reduce downstream process fluctuations.
The membrane system and protection package can be adjusted to match hydrogen sulphide level, humidity, and local climate.
Double membrane gasholder and double membrane gas holder describe the same low-pressure storage system. Start with the installation arrangement, then agree the usable volume, gas duty and supply interfaces—not just the size of the dome.
Independent storage on a prepared foundation. Check available land, drainage, anchoring, gas piping and access for membrane maintenance.
This configurationStorage supported by the tank perimeter. Check rim geometry, structural loads, gas-tight connections and access together with the tank designer.
Review this configurationDo not assume they are interchangeable. Agree the usable volume and operating range from the production–consumption profile, membrane geometry and level-measurement arrangement. A project photograph’s capacity label is not a sizing calculation.
List membranes, anchoring and seals, support-air equipment, instrumentation, controls and piping interfaces. Identify who supplies foundations, transport, installation, commissioning and service. Do not assume every item is included in the membrane price.
No. Material values describe the selected membrane under stated source methods. They do not by themselves verify the whole installation’s pressure, site loads, service life or fire classification. Confirm the selected material and project-specific design documents separately.
| Effective Volume | 300-150,000 m³ |
|---|---|
| Working Pressure | 1,000-5,000 Pa |
| Design Temperature | -40°C to +70°C |
| Installation | Ground-mounted on an independent foundation |
| Structure | Inner gas membrane + outer form membrane + sealed base membrane |
| Service Life | 15-20 years |
This table retains the existing product specifications. Capacity, pressure, membranes and instruments must be confirmed against project duty; capacities in photographs are not a substitute for design selection.
The dual-channel equalization design splits air supply into two relatively independent flow paths. It reduces one-sided bulging, wrinkling, and local stress concentration for more uniform outer-membrane shape control.
Mechanical overpressure and under-pressure protection acts first and prevents the membrane from exceeding allowable stress.
Pressure, level, and blower status are monitored together. Abnormal conditions trigger alarms and corrective air-supply control.
Hard interlocks with the flare, genset, and main inlet valve execute shutoff and safe relief when the system trips.
Locations, capacities and equipment types below are drawn from MOTET project records. Select a thumbnail to explore each site, or open a photograph at full size.
Click to view full image
Capacities retain the source records’ m³ notation; normalized volume and usable gas storage are not inferred. The photographs do not imply identical membranes, pressures or controls across projects.
The Northeast China record identifies coal-gas storage, not biogas duty. Industrial coal-gas applications require a separate review of composition and safety requirements.
MOTET MATERIAL DATA
The inner membrane retains gas; the outer membrane provides weather protection and is held in shape by support air. These material options support project-specific selection, not a universal specification for every holder.
Options are references, not a performance ranking. Permeability values under different temperatures or test conditions are not directly comparable.
Inner membrane · gas retention
Source date:
Inner membrane · gas retention
Source date:
Inner membrane · gas retention
Source date:
Outer membrane · weather protection
Source date:
Compiled from membrane technical data for project-specific material selection.
These are material data, not MOTET test reports, whole-holder certification or contractual guarantees. Material permeability is not whole-holder leakage. Selection also requires gas composition, temperature, loads, interfaces and fabrication conditions; approved project and batch documents govern.
Compare quotations on the same usable volume, pressure and gas duty. Membrane specification, site loads, support-air equipment, instruments, controls, transport, installation and after-sales scope affect the package price. A nominal-volume price alone is not a like-for-like comparison; request an itemized project quotation.
Send your project duty and selection requirements →For an existing holder, provide drawings, operating conditions and inspection photographs before deciding on repair or replacement. Retaining an outer membrane requires its condition and compatibility to be assessed; the sealing interfaces, lifting plan, controls and acceptance tests must also be defined. The records below explain the work, not a guarantee that every existing holder is suitable.
Installation guidance, commissioning, training, spares, site support and warranty terms follow the agreed contract.