Shanghai Plant Odor Control Upgrade
Main duct switchover and scrubber integration were completed within the planned downtime.
Shanghai · 03/01/2026 · 7 days left
Product:CSC Biofilter Deodorization Module
View Details
Project Cases
A fixed viewing wall of project cards that keeps circulating inside the page.
Main duct switchover and scrubber integration were completed within the planned downtime.
Shanghai · 03/01/2026 · 7 days left
Product:CSC Biofilter Deodorization Module
View Details
Critical interlock logic is closed and the project is ready for continuous load testing.
Ningbo, Zhejiang · 02/18/2026 · Completed
Product:CSC Smart Airflow Balancing System
View Details
Operation training is complete and key monitoring points remain stable during trial run.
Chengdu, Sichuan · 02/06/2026 · Completed
Product:CSC Composite Scrubber Unit
View Details
Equipment lifting and trunk-duct welding are progressing in parallel with stabilized safety inspections.
Qingdao, Shandong · 01/26/2026 · Completed
Product:CSC High-Efficiency Deodorizing Media
View Details
After the new control strategy, fan load distribution is more balanced and energy metrics keep dropping.
Suzhou, Jiangsu · 01/12/2026 · Completed
Product:CSC Smart Control Cabinet V3
View Details
Continuous operation tests have started and emission metrics are entering a stable range.
Wuhan, Hubei · 12/30/2025 · Completed
Product:CSC Negative Pressure Collection Network
View Details
Peak-hour emergency workflow rehearsal is complete with seamless shift handover.
Chongqing · 12/15/2025 · Completed
Product:CSC VOC Rapid Adsorption Module
View Details
The commissioning plan is split into three phases and phase one calibration is done.
Xiamen, Fujian · 11/22/2025 · Completed
Product:CSC Multi-stage Purification Tower
View Details
After sampling-port optimization, anomaly location time dropped to 40% of previous baseline.
Shanghai · 11/08/2025 · Completed
Product:CSC Smart Sampling Monitor
View Details
Handover documents, maintenance plans, and spare lists have been jointly signed off.
Tianjin · 10/20/2025 · Completed
Product:CSC Low-temperature Purification Unit
View Details
Night-shift and weekend retests passed, and key equipment maintenance is now routine.
Hefei, Anhui · 10/05/2025 · Completed
Product:CSC Cleanroom Exhaust System
View Details
Alarm frequency dropped significantly after the upgrade, and dashboard reconstruction is complete.
Foshan, Guangdong · 08/14/2025 · Completed
Product:CSC High-airflow Pulse Control System
View Details